13/12/2018
1
ZONAS MINADAS
ENERO 2008 DICIEMBRE 2011 OCTUBRE 2012
PROVINCIA IDENT CLOSE PEND IDENT CERR PEND IDENT CERR PEND
EL ORO 17 16 1 24 20 4 24 24 0
LOJA 25 17 8 27 24 3 27 27 0
ZAMORA CHINCHIPE
1 0 1 6 0 6 6 0 6
MORONA SANTIAGO
75 20 55 89 70 19 89 79 10
PASTAZA 10 0 10 10 0 10 10 0 10
TOTAL 128 53 75 156 114 42 156 130 26
1998 SIGNATURE OF PEACE ECUADOR - PERÚ
1999 CONVENTION ON THE PROHIBITION OF THE USE, STOCKPILING, PRODUCTION AND TRANSFER OF ANTI-PERSONNEL MINES ANDON THEIR
BACKGROUNDT
13/12/2018
2
I PHASE 2000 ‐ 2008
Areamines
All of area(m2)
Mines AP Mines AT
56 125.080,64 4.797 69
Areamines
All of area(m2)
Mines AP Mines AT
130 388.904,13 7.087 5
II PHASE 2009 ‐ 20017
III PHASE 2018 ‐ 2022
Areamines
All of area(m2)
Mines AP Mines AT
4 11.546 190 0
13/12/2018
3
GEOGRAPHIC SCENARIO
CONDITIONS OF OPERATIONS
Demining operations
Medical evacuationBORDER ECUADOR PERU
(DEMINING AREA)
Demining operations
13/12/2018
4
BINATIONAL UNIT
SHAPINGPLANNING
DOCTRINE
OPERATIONS OF D.H. (2000 – OCTOBER 2018)
YearArea
cleared m2Area
Canceled m2
Área Reduced
m2
Área free m2
# MinesA.P
destroyed
# Mine A.T destroyed
# UXOS
2000 43.956,50 43.956,50 2.699 232001 11.021,00 11.021,00 1.4692002 3.999,00 3.999,00 135 37 12003 24.971,19 24.971,19 60 1 12004 12.990,00 12.990,00 35 32005 7.122,20 7.122,20 32 32006 12.219,00 12.219,00 68 22007 2.586,50 2.586,50 123 1 12008 6.215,25 6.215,25 176 42009 8.191,38 8.191,38 85 32010 33.438,72 9.500,00 42.938,72 5 22011 60.110,30 6.166,54 66.276,84 292012 21.910,80 47.106,00 69.016,80 813 5
2013 12.331,00 12.331,00 1832014 39.660,50 47.744,50 87.405,00 4.181 92015 66.414,00 16.177,00 82.591,00 773 22016 1.410,00 3.267,00 4.677,00 565 22017 15.476,39 15.476,39 453 52018 11.546,00 18.251,68 2.538,61 29.797,68 190 2
Summary 395.569,73 148.212,72 2.538,61 543.782,4 12.074 74 33
13/12/2018
5
103.472,25 m2
66.314,18 m2
PASTAZAPASTAZA
MORONA SANTIAGO MORONA SANTIAGO
ZAMORACHINCHIPEZAMORACHINCHIPELOJALOJA
EL OROEL ORO
31.070,00 m2
KM2
TIWINTZAKM2
TIWINTZA
230.879,95 m2
CHALLENGES UNTIL 2022
GOALS TO BE MET UNTIL 2022
Province Area m2 # Mines
Zamora Chinchipe 82.760,00 3.317
Total general 82.760,00 3.317
71.301,00 m2
82.760,00m2
87%
13%
Area cleared 543.782,45 m2
Area for work 82.760,00 m2
19.561,39 m2